Media Summary: Video includes installation of culverts into the second (northbound) tunnel, construction of the temporary bridges at the Northern ... Construction work surge ahead on the Waterview Watch construction of the vent stack at the Southern Ventilation Building, continuation of the permanent roads at the Northern ...
Well Connected Alliance April 2015 Timelapse - Detailed Analysis & Overview
Video includes installation of culverts into the second (northbound) tunnel, construction of the temporary bridges at the Northern ... Construction work surge ahead on the Waterview Watch construction of the vent stack at the Southern Ventilation Building, continuation of the permanent roads at the Northern ... Footage includes construction of the permanent road, work at the Northern Approach Trench, exterior cladding panels erected on ... Watch the construction of the permanent roads at the Northern Approach Trench, the erection of external cladding to the southern ... Footage from the Southern Approach Trench (SAT) and the SAT sump where Alice is pushed out to prepare for dismantle.
Follow Alice TBM's big turnaround using NZ sheep grease in the Northern Approach Trench in this month's Watch a close-up view of how Dennis the giant yellow gantry moves to place beams on ramps at the Great North Road ... Watch installation of the exterior panels to the top of the Southern Ventilation Building, removal of the temporary bridges at the ... Some of the key highlights includes construction of the three sub levels of the Southern Ventilation Building, and the Great North ... Footage includes roof work over the southbound carriageway, turning gantry 3 into the northbound tunnel, culvert gantry and ... Key highlights include Building the southbound carriageway, laying foundations of the ventilation stack, segments transferred by ...
See inside tunnel one (southbound) as the Watch Alice Tunnel Boring Machine (TBM) move through the first tunnel (southbound), the culvert gantry place concrete culverts ... See how our spoil from Alice Tunnel Boring Machine (TBM) work underground is transferred from conveyor to our spoil handling ... Video of work activity at various locations around the Waterview Follow the preparation work for Alice TBM's relaunch in the second (northbound) tunnel. The ventilation stack of the Southern Ventilation Building is completed, at the Northern Approach Trench construction starts on the ...
Watch the assembly of the Culvert Gantry at the Southern Approach Trench. The first culvert is forklifted into the tunnel, tunnel ...